Submitted by Guest 4545 (not verified) on Thu, 08/04/2011 - 9:03am.
If the NCDOT works on Kerr Ave the same way they worked on Village Boulevard in Leland, the residents should be worried.
The project in Leland has taken so long it's almost "generational" i.e. passed down from father to son.
The only time the NCDOT does anything in a timely fashion is when the project is in the Raleigh or Charlotte area.
They Should be Worried!
If the NCDOT works on Kerr Ave the same way they worked on Village Boulevard in Leland, the residents should be worried.
The project in Leland has taken so long it's almost "generational" i.e. passed down from father to son.
The only time the NCDOT does anything in a timely fashion is when the project is in the Raleigh or Charlotte area.