This is an interesting situation.
They studied the road and determined it needs better asphalt. I can see the need for that as 3rd St is heavily traveled but what irks me about road paving is that within 3 weeks you will see someone digging up the road to do a repair of some sort.
And the patch put over that repair?
Typically second rate asphalt.
taxpayer....
This is an interesting situation.
They studied the road and determined it needs better asphalt. I can see the need for that as 3rd St is heavily traveled but what irks me about road paving is that within 3 weeks you will see someone digging up the road to do a repair of some sort.
And the patch put over that repair?
Typically second rate asphalt.
I get so aggravated...........
Vog