Need to be a bridge builder to know when Good Friday is?

(1) That side of the bridge was closed and couldn’t be opened for holiday traffic
(2) No one debates the fact that the bridge need repair
(3) The two existing (eastern drivable) lanes were intermittently closed because of the concrete pour on the two western (closed) lanes causing traffic to back up for miles
(4) With a little planning, and little consideration, the concrete pour could have been done on the Thursday prior to Good Friday or on the following Monday. Both of those days would have considerably less traffic than the amount traditionally seen on that Friday.

Apparently, you have zero conception of what I was even talking about. Time to remove that hair from your posterior and stop being an idiot.

Reply

The content of this field is kept private and will not be shown publicly.
  • Web page addresses and e-mail addresses turn into links automatically.
  • Lines and paragraphs break automatically.

More information about formatting options

To prevent automated spam submissions leave this field empty.
CAPTCHA
Please re-enter the code shown in the image below.