Traffic Command

NCDOT Traffic Incidents in New Hanover county

NCDOT - Traveler Information Management System (TIMS). Retrieve real time information on events that cause severe and unusual congestion on NCDOT maintained roadways in North Carolina

The North Carolina Department of  Transportation will begin milling and resurfacing 1 of 5 lanes on May 26th through October 31 nightly at 8:00 pm until 6:00 am with weather permitting.  The Department will have intermittent lane closures from West Lake Shore Drive to Independence Boulevard.  The benefit of the work is the existing pavement is in need of repair and rehabilitation.  The milling will remove the damaged and deteriorated pavement and replace it with new pavement.  There will be no on street parking during this work and towing will be enforced.
Posted: July 6, 2015, 2:22 pm
NCDOT will be repairing and inspecting the metal deck on the lift span.
Posted: July 6, 2015, 12:22 pm
The NCDOT Bridge Maintenance Department will be assisting an elevator repair company in servicing the two elevators as required by inspection criteria.
Bridge #13 Cape Fear Memorial .
Posted: June 29, 2015, 12:49 pm
The North Carolina Department of Transportation will have intermittent lane closures on Third Street (US-421) between Greenfield Street and Wooster Street (Eastbound US 74/76) in New Hanover County beginning Monday May 11, 2015 at 8:00pm until 6:00am nightly thru October 31, 2015 for milling and resurfacing, weather permitting.  This is for repair and rehabilitation of the existing pavement.  There will be a milling operation and replacement with new pavement.
Posted: June 16, 2015, 3:46 pm
Bridge Replacement.
Posted: March 11, 2015, 3:16 pm
Beginning Tuesday, April 15, 2014 SR-2169 Fredrickson Road will be permanently closed to thru traffic due to the construction of the Wilmington Bypass-R2633BB.  Access to Fredrickson Road will be made using Sutton Lake Road (SR-2145).  
Posted: August 20, 2014, 9:30 am